<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Public Comment Period – FC No. 2025-0012 &#8211; Department of Public Works’ Consistency Certification for its Proposed Route 1 Reconstruction of Multiple Bridges Hagåtña to Piti, Guam Project No. GU-DAR-0001 131	</title>
	<atom:link href="https://bsp.guam.gov/public-comment-period-fc-no-2025-0012-department-of-public-works-consistency-certification-for-its-proposed-route-1-reconstruction-of-multiple-bridges-hagatna-to-piti-guam-proje/feed/" rel="self" type="application/rss+xml" />
	<link>https://bsp.guam.gov/public-comment-period-fc-no-2025-0012-department-of-public-works-consistency-certification-for-its-proposed-route-1-reconstruction-of-multiple-bridges-hagatna-to-piti-guam-proje/</link>
	<description>The Bureau of Statistics and Plans’ mission is to build a better Guam through statistical insights and data driven planning.</description>
	<lastBuildDate>Mon, 19 May 2025 22:07:02 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
</channel>
</rss>
