<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	>
<channel>
	<title>
	Comments on: Public Comment Period – FC No. 2025-0016- Department of the Army U.S. Army Corps of Engineers, Honolulu District Consistency Determination for Proposed Nationwide Permits (NWPs) Reissuance	</title>
	<atom:link href="https://bsp.guam.gov/public-comment-period-fc-no-2025-0016-department-of-the-army-u-s-army-corps-of-engineers-honolulu-district-consistency-determination-for-proposed-nationwide-permits-nwps-reissuance/feed/" rel="self" type="application/rss+xml" />
	<link>https://bsp.guam.gov/public-comment-period-fc-no-2025-0016-department-of-the-army-u-s-army-corps-of-engineers-honolulu-district-consistency-determination-for-proposed-nationwide-permits-nwps-reissuance/</link>
	<description>The Bureau of Statistics and Plans’ mission is to build a better Guam through statistical insights and data driven planning.</description>
	<lastBuildDate>Fri, 27 Jun 2025 12:12:58 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.4</generator>
</channel>
</rss>
